Thread Rating:
  • 37 Vote(s) - 2.95 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Faac 455D opening/closing time setting
#1
Hello Everyone,
I have 455D board control installed and I have a little issue with.Both gates are to slow in motion for opening and closing.I was reading the manual 3-4 times but i couldn’t find haw can I set that time of closing/opening witch can be set fom 0-120s.
Can anyone give me an advice how I can do that.
My gates are pretty close to the main road and is a bit dangerous to stop and wait for my gates to open.I just want to increase this time.
Many regards,Niko
Reply


Messages In This Thread
Faac 455D opening/closing time setting - by Niko - 03-02-2019, 11:44 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
  FAAC Eq45s , only Leaf A closing with remote Cummil2 1 736 13-03-2025, 10:06 AM
Last Post: benbrooks
  FAAC Eq45s , only Leaf A closing with remote Cummil2 1 725 13-03-2025, 10:05 AM
Last Post: benbrooks
  FAAC S800 Single swing Gate not responding robhight 0 1,535 18-11-2024, 11:48 AM
Last Post: robhight
  FAAC Configure 443Hz remote to open partially, pause and close Ezylryb 1 1,553 12-08-2024, 03:52 PM
Last Post: Jakedugmore
  FAAC problem dennisoates 0 1,279 30-06-2024, 04:40 PM
Last Post: dennisoates
  Intermittent ‘Stop’ command - FAAC 741 Sliding Gate bwel 3 4,421 22-04-2024, 03:21 PM
Last Post: JoeF
  Faac 415 can't reset from manual to operate mode Stephen Q 1 4,027 18-03-2024, 01:20 PM
Last Post: RXH
  Faac 455d Grantplant 1 4,940 13-11-2023, 11:58 AM
Last Post: Aiden Mitton
  FAAC 740 limited travel LoneStarCycler 0 4,659 24-06-2023, 01:06 AM
Last Post: LoneStarCycler
  FAAC 400 cbac LN 104202 obey gates 1 9,588 21-11-2022, 09:54 AM
Last Post: SamA

Forum Jump:


Users browsing this thread: 3 Guest(s)