Thread Rating:
  • 321 Vote(s) - 2.72 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Wiring control panel apritech mach2 230v
#6
(29-10-2014, 08:51 PM)thm Wrote: Yes I have two motors, I will be doing this on saturday, so this is very helpful. The other thing is the fob, do I need to do anything with this? Or will this work when I programme the gates as below?

Would you know which connectors are used for intercom/keypad?

Thanks Again for your help?
Brian.
If you have just 1 motor then:
#6 <- Black (or Brown) & one capacitor wire
#7 <- Brown (or Black) & other capacitor wire
#8 <- Grey

You have to test if Black should be connected to #6 or #7 (leaving Brown to be connected to the other contact).

If you have 2 motors then the primary motor (the one connected to 6, 7 & 8 as per above) should be the one that attaches to the gate leaf that can open without being obstructed by the other leaf (this would also be the leaf that should open first and close last).

The secondary motor (the motor on the other leaf) is connected as follows:
#9 <- Brown (or Black) & one capacitor wire (2nd capacitor)
#10 <- Black (or Brown) & other capacitor wire (2nd capacitor)
#11 <- Grey

Now for the check:

Move both leaves midway (half-open), engage the operators (so that the leaves can be moved by the motors) and connect power to the control board. Now, proceed, more or less, as described in 'OPENNING TIME PROGRAMMING':
1) To enter in programming press P2 for 2+ seconds - the LED L3 should turn on
2) Press PG1 and verify that the primary leaf opens (if it closes, cut power and switch black and brown wires in contacts #6 and #7, then start over)
3) Press PG2 and verify that the secondary leaf opens (if it closes, cut power and switch black and brown wires in contacts #9 and #10)
4) Stop both leaves by cutting power, before reaching their end positions.
This is not a full learning cycle - just a test to see if we have got the black and brown wires in the right contacts (using a trial-and-error procedure).

Now you have to perform the learning cycle (starting from the closed posistion and going all the way to the fully open positioon for each leaf) as described in the manual.

Tips:
1) be sure to follow the installation instructions in regards with distances of the fixed pivot point of the operator from the axis of the hinges
2) the gate should have mechanical endstops for the fully open and fully closed positions of each leaf (limiting the opening angle to the maximum one prescribed for the installation geometry you chose)
Reply


Messages In This Thread
RE: Wiring control panel apritech mach2 230v - by brian - 29-10-2014, 09:42 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
  Hello Looking for gate control help everettc4 1 7,254 05-02-2021, 01:12 PM
Last Post: JamieF
  Wiring a maglock Solvika 0 6,577 09-03-2016, 10:46 PM
Last Post: Solvika
  Q80A Control Box Paj 0 7,380 03-09-2015, 07:36 PM
Last Post: Paj
Wink Geniss Gates with Genius BRAIN 03 Control Board 4LPS 3 18,763 10-08-2015, 09:31 PM
Last Post: 4LPS

Forum Jump:


Users browsing this thread: 3 Guest(s)