Thread Rating:
  • 358 Vote(s) - 2.86 Average
  • 1
  • 2
  • 3
  • 4
  • 5
230v Lyn400 CB11 Board Capacitor req.
#5
Thanks for the reply - I have the left side as the wing 1 and the right side as wing 2 looking from inside the property as they open outwards. On opening wing 2 looks like it's reacting 1 or 2 seconds quicker than wing 1 but the maglock is holding it until it opens enough to release. Once they have opened wing 2 closes a few seconds before wing 1 and they overlap nicely and close no problem. If the wiring was wrong would wing 2 still close before wing 1?

I would like to delay wing 2 opening by a few seconds and they would be fine.

Probably time to call in the experts, don't suppose you cover Salisbury area?
Reply


Messages In This Thread
RE: 230v Lyn400 CB11 Board Capacitor req. - by redbluetwo - 06-10-2011, 11:11 AM

Possibly Related Threads…
Thread Author Replies Views Last Post
  Difference: SCS300, LYN300, and LYN400? DevsAd 3 4,897 02-03-2023, 03:12 PM
Last Post: SamA
  CB11 Multiple Keypad support Pigsfoot 1 2,757 12-08-2022, 08:14 AM
Last Post: Michael
  Problem with delay time CB11 milan 2 11,737 04-10-2021, 01:44 AM
Last Post: DesmondVog
  Which original remote control is suitable for board CB124 Evan 3 10,480 20-06-2019, 04:26 PM
Last Post: Devs
  LiftMaster SUB300M + CB11 fault jonesy1991 0 11,061 25-01-2016, 02:51 PM
Last Post: jonesy1991
  Opening delay on SCS300 (CB124 board) willows79 0 9,018 02-12-2015, 09:45 PM
Last Post: willows79
  CB11 controller BrianP 2 14,656 16-09-2015, 08:58 AM
Last Post: Gateguy
Rolleyes Chamberlin Liftmaster Professional (CB24 & dual LYN400.24v) SDL 4 29,757 29-12-2013, 02:26 PM
Last Post: Tussun
  liftmaster CB11 hold gate open problem sparkey 5 32,566 13-05-2013, 08:17 AM
Last Post: brucekwilles
  Problem with CB11 Board Michael 1 12,149 08-05-2013, 11:32 AM
Last Post: Mark

Forum Jump:


Users browsing this thread: 1 Guest(s)